{"page":{"id":388,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://wrenchtee.shop/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-11-17\">November 17, 2026</time></p>\n<p>Every Wrench Tee order is made for the person who placed it, which is why the change window is short and clearly marked. This page explains how long you have to cancel an order or change it, what kinds of change we can make, how to ask, what happens to your money, and what to do once the window has closed. Questions go to <a href=\"mailto:support@wrenchtee.shop\">support@wrenchtee.shop</a>, and we reply within 24 hours on business days.</p>\n<section class=\"policy-summary\">\n<h2>Cancel or change at a glance</h2>\n<ul>\n<li><strong>Window:</strong> 24 hours from the time you placed the order, to cancel it or change it.</li>\n<li><strong>How:</strong> email <a href=\"mailto:support@wrenchtee.shop\">support@wrenchtee.shop</a> with your order number and the change you need.</li>\n<li><strong>Personalised text:</strong> name, garage name, est. year and town can be corrected inside the 24 hours.</li>\n<li><strong>After 24 hours:</strong> the order is in production; once it arrives, the 60-day return applies.</li>\n<li><strong>Returns refund:</strong> sent within 7 days of receiving the return.</li>\n</ul>\n</section>\n<h2>1. The 24-hour window</h2>\n<p>You can cancel an order or change it within 24 hours of placing it. The clock starts at the time shown on your order confirmation email, not at midnight and not at the start of the next business day. An order placed at 4:10 p.m. on a Tuesday can be cancelled or changed until 4:10 p.m. on Wednesday.</p>\n<p>The reason is simple. Making time is 1-3 business days, and every tee, hoodie, cap, sign and mug is produced for that order. Once production starts, the printed garage name cannot be lifted off a hoodie, and a sign with the wrong town on it cannot be turned back into a blank. The 24 hours are the stretch where the job is still on the clipboard and nothing has gone under the press.</p>\n<h3>Weekends and the window</h3>\n<p>The window counts actual hours, so it runs through weekends. If you order on a Saturday morning and notice a problem on Saturday night, email us straight away. Your email&#8217;s timestamp is what counts: as long as it reaches us inside the 24 hours, the request is inside the window, even if our reply comes on the next business day.</p>\n<h2>2. How to ask for a cancellation or a change</h2>\n<ol>\n<li>Find your order number in the order confirmation email.</li>\n<li>Email <a href=\"mailto:support@wrenchtee.shop\">support@wrenchtee.shop</a> from the address you used at checkout. Put &#8220;Cancel&#8221; or &#8220;Change&#8221; and the order number in the subject line.</li>\n<li>In the body, say exactly what you want: cancel the whole order, cancel one item, or change a size, a colour, a personalised line or the shipping address. For text changes, type the new text exactly as it should print.</li>\n<li>Wait for our written reply. The request is settled when you have our email confirming it.</li>\n</ol>\n<p>The <a href=\"/submit-ticket/\">Submit a Ticket</a> page has a ready-made subject line for change requests and a short list of what to include, if you want a checklist to work from.</p>\n<h2>3. Changes we can make inside the window</h2>\n<table class=\"policy-table\">\n<caption>What can be changed within 24 hours of ordering</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">Example</th>\n<th scope=\"col\">What to send us</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Size</td>\n<td>An XL Drop Light Long Sleeve Tee switched to 2XL</td>\n<td>The item and the new size</td>\n</tr>\n<tr>\n<td>Colour or option</td>\n<td>A different colour of the same tee, or the 18 x 12 in sign instead of the 12 x 8 in</td>\n<td>The item and the new option</td>\n</tr>\n<tr>\n<td>Personalised text</td>\n<td>A name, garage name, est. year or town line</td>\n<td>The new text, typed exactly as it should print</td>\n</tr>\n<tr>\n<td>Shipping address</td>\n<td>A missing unit number, or sending it to his shop instead of his house</td>\n<td>The full corrected address</td>\n</tr>\n<tr>\n<td>Remove an item</td>\n<td>One of three items is no longer needed</td>\n<td>Which item to drop</td>\n</tr>\n<tr>\n<td>Cancel the order</td>\n<td>The whole order is no longer wanted</td>\n<td>The order number and the word &#8220;Cancel&#8221;</td>\n</tr>\n</tbody>\n</table>\n<p>Some changes move the price. Sizes 2XL and 3XL add $2, 4XL and 5XL add $4, the 18 x 12 in garage sign adds $10, and filling the optional garage name on the back of a Name Over the Heart Tee or Hoodie adds $5. If your change moves the total up or down, we tell you the new amount first and explain how the difference will be settled before we make the change.</p>\n<h2>4. Fixing personalised text</h2>\n<p>We print exactly what is typed into the personalisation fields: spelling, capitals and spacing. No proof or mockup is sent before production. The live preview card on the product page, the cart, checkout and the order email all repeat the text you entered, so the order email is the best place to read it one more time after you have paid.</p>\n<h3>A typo caught three hours later</h3>\n<p>A wife orders a Name Over the Heart Shop Tee for her husband&#8217;s birthday. She types MIKE in the name field and MIKES GARAGE on the back. Three hours later, reading the order email, she sees the apostrophe is missing and that he spells it MIKE&#8217;S. She is well inside the 24 hours. She emails us with her order number, the subject &#8220;Change&#8221;, and the corrected text written out in full: name MIKE, garage name MIKE&#8217;S GARAGE, est. year 1998. We reply confirming the new text, and that is the version that prints.</p>\n<h3>A garage name that is too long</h3>\n<p>The garage name field on the Name Over the Heart Tee and Hoodie takes up to 20 characters. DELGADO FAMILY AUTOMOTIVE REPAIR is 32, so it will not fit. If you squeezed in a shortened version in a hurry and want to rethink it, the 24-hour window is your chance. DELGADO AUTO fits easily and reads from across the bay. Send the new line in capitals the way you want it printed. The same goes for the Garage Name Sign, whose name line takes up to 14 characters and town line up to 18, and for the Garage Est. 15 oz Mug, whose name takes up to 14 and garage name up to 18.</p>\n<h3>Adding or removing optional lines</h3>\n<p>Leaving out the est. year, adding a town to the sign, or dropping the garage name on the back are all ordinary changes inside the window. Write the full set of lines as they should end up, not just the line that changed, so there is no doubt about the final text.</p>\n<h2>5. Cancelling, and what happens to your money</h2>\n<p>If you cancel the whole order within 24 hours, we confirm the cancellation by email and refund the order to the payment method used at checkout. If you cancel one item out of several, we refund that item and make the rest. Shipping is free on every order, so there is no shipping charge to add back. If the refund does not show on your statement within a few days of our confirmation, email us and we will look into it with you.</p>\n<p>For orders that have already arrived, the return path applies instead, and the money side is fixed: the refund is sent within 7 days of receiving the return. The <a href=\"/refund-policy/\">Refund Policy</a> sets out how returned-order refunds are paid.</p>\n<h2>6. After the 24 hours have passed</h2>\n<p>Once the window closes, the order is in production and we can no longer cancel it or change what gets printed. Email us anyway if something is wrong, especially with the shipping address; we will tell you honestly what can still be done.</p>\n<p>When the parcel arrives, you are not stuck with it. Every item, personalised ones included, can be returned within 60 days of delivery. For a change-of-mind return we pay the postage and send you a free return label. The refund is sent within 7 days of receiving the return. If the problem is a size, the return and a fresh order in the right size is the straightforward route. The steps are on our <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a> page.</p>\n<h3>Four techs, four sizes</h3>\n<p>A small independent shop of four techs orders four No Comebacks Tees in M, XL, 3XL and 5XL. Each tee is a single item at its listed price with its size add-on; there is no minimum and no multi-tee discount. The next morning one tech says he wears a 4XL, not a 5XL. That is still inside the 24 hours, so the size is switched and the difference is explained first. Had he spoken up a week later, the 5XL would have arrived, gone back with the free return label, and a new 4XL order would have followed.</p>\n<h2>7. A two-minute read of the order email</h2>\n<p>The best way to use the 24 hours is to read the order email once, slowly, the way a service writer reads a ticket back to the customer before the car goes in the bay. It takes two minutes and catches almost every problem we see.</p>\n<ul>\n<li><strong>Size against the shirt he already wears.</strong> If you measured one of his favourite tees, check the size you picked matches what the <a href=\"/size-guide/\">Size Guide</a> pointed you to. Unisex fit runs straight, so a guy whose shop shirts always feel tight across the chest may want one size up.</li>\n<li><strong>Every personalised line, letter by letter.</strong> Read the name, the garage name, the est. year and the town out loud. Watch for a missing apostrophe, a doubled letter, a swapped digit in the year (1989 instead of 1998) and an extra space.</li>\n<li><strong>The second line on the Garage Name Sign.</strong> It is chosen from GARAGE, SHOP, AUTO SHOP or SPEED SHOP. Make sure the one in the email is the one he would say out loud.</li>\n<li><strong>The sign size and the mug size.</strong> 12 x 8 in or 18 x 12 in for signs; 11 oz or 15 oz for mugs.</li>\n<li><strong>The shipping address.</strong> Unit number, postal code, country, and whose name is on the parcel if it is a surprise.</li>\n</ul>\n<p>If everything reads right, there is nothing to do. If something is off, you know exactly what to put in the email, and you still have hours to spare.</p>\n<h2>8. Common change questions</h2>\n<h3>Can I add an item to an order I already placed?</h3>\n<p>The simplest route is a second order. It ships free on its own, with no minimum, and it runs on its own clock, so it does not hold up the first one.</p>\n<h3>Can I change the product, not just the size?</h3>\n<p>Inside the 24 hours, email us with the item you have and the item you would rather have. We will explain the options and any price difference before anything changes. Often the cleanest answer is to cancel the one item and place a new order for the other.</p>\n<h3>I asked for a change but have not heard back yet.</h3>\n<p>If your email reached us inside the 24 hours, it counts as inside the window. We reply within 24 hours on business days. If you sent it on a weekend, expect our reply on the next business day.</p>\n<h2>9. If we have to cancel</h2>\n<p>Now and then we may need to cancel an order ourselves, for example if a product cannot be made as listed, a price was shown wrongly, or the shipping address is outside the four countries we ship to: the United States, Canada, Australia and New Zealand. If that happens, we email you, explain why, and refund the order to the payment method used at checkout.</p>\n<h2>10. Gift orders and timing</h2>\n<p>Cancelling and reordering resets both clocks: 1-3 business days of making time and 7-14 business days of transit. If the gift has a date, a change inside the window is quicker than a cancel-and-reorder, because the original order keeps its place. The counting method and the holiday dates are on our <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a> page. Remember that the total is an estimate from our stated times, not a guarantee.</p>\n<h2>11. Contact</h2>\n<p>Email <a href=\"mailto:support@wrenchtee.shop\">support@wrenchtee.shop</a> with your order number and the word &#8220;Cancel&#8221; or &#8220;Change&#8221; in the subject line. We reply within 24 hours on business days. For order status, see <a href=\"/order-tracking/\">Order Tracking</a>; for general questions, the <a href=\"/help-center/\">Help Center</a>.</p>\n<p>Wrench Tee, 111 Lee Drive, Middlesex, NJ 08846, US.</p>\n","visible_characters":10572,"meta_description":"Cancel or change a Wrench Tee order within 24 hours: sizes, options, addresses and personalised names, garage names and est. years, with clear steps by email.","parent":null,"published_at":"2026-11-17T04:06:25+00:00","updated_at":"2026-11-17T04:06:25+00:00"}}